Case
Home > Case

Construction management process of double oil tank

By Manager
Date: Aug 04, 2020
The contents of double-layer oil tanks are all oil, so we must pay great attention to the process of using pressure vessels. In the construction management of double-layer oil tanks, construction responsibilities must be clarified, and management concepts need to be implemented to manage technical points. Strengthen the management of construction progress, make the gas station put into operation as soon as possible, and manage the stability of construction.

1. Clarify construction responsibilities
The construction of double-layer oil tanks has strict technical requirements and requires on-site command and management. All departments must clarify their respective management responsibilities to ensure the smooth progress of the double-layer oil tank construction. For example, the gas station construction unit shall be responsible for the geological survey of the gas station area and the collation of the survey data and related materials of the oil tank to provide reference for the design department to formulate the construction plan. In addition, it is necessary to do a good job of on-site construction supervision throughout the process to ensure personnel stability and project quality.

2. Management of key points of construction technology
To implement the whole-process management concept, management and control must be carried out in all aspects of pressure vessel reconstruction and construction. For example, in the preparation stage of the project, the original single-layer oil storage tank of the gas station should be removed first. The tank body must be cleaned in advance during the dismantling operation, the power supply and the electrostatic grounding card must be cut off, the pressure vessel protection or supporting equipment shall be removed, and the oil tank shall be sealed and meet the dismantling requirements before the pressure vessel can be lifted from the tank pit by a crane.
3. Construction schedule management
Strengthening schedule management can make the gas station put into operation as soon as possible. In the anti-seepage reconstruction construction, the following measures can improve the construction schedule management level: prepare a schedule and carry out the work strictly according to the plan during the construction process, which can improve the resource utilization rate and deliver the project within the scheduled construction period. Carry out dynamic management, carry out weekly and monthly project progress report meetings to control the progress of renovation construction.
Last article:
Next article:
Send Your Inquiry
We not only provide a good product, but also provide high quality service. If you are interested in our products,
you can contact us in the following ways.
Your name:
*Your email:
Your phone:
*Your inquiry:
Home
Products
Tel
E-mail
Inquiry